The Virtual Line presents the Maker-Checker process, in which every change made in the flow must be approved and deployed by the Owner/Admin; otherwise, the changes are just saved as Draft.
Process:
| Owner and Admin | Member |
|---|---|
| 1. Edit | 1. Edit |
| 2. Make changes | 2. Test |
| 3. Test | 3. Request to go live |
| 4. Deploy | 4. Owner/ Admin approves |
| 5. Deploy |
Owner and Admin access
Make a test call with the new flow (changes are not saved at the moment).

Save and Launch this version (Deploy)
- Launch now:
- Tick Publish now > Publish
- Launch later:
- Choose date and time > Schedule
- Add note: Optional

If you choose the option means back to the stable version.

Our system is able to show the latest 5 versions
- Version name and status (Draft or Active)
- Created date and time
- Changes made by whom
- Actions:
- Rollback to an old version
- Delete a version

Member access
- Owner/Admin is notified of the request when they visit Virtual Line. Click the flow name to see the change.

- Owner/Admin choose either to test the flow, approve (launch), reject, or postpone reviewing this draft (back to the stable version).

- If they click the Arrow icon <–, they will be reminded of the draft until they approve/reject it.





